Page 1 of 2 1 2 LastLast
Results 1 to 10 of 18
  1. #1
    YamahaToys's Avatar
    Join Date
    Jan 2007
    Location
    Orange, TX
    Posts
    583

    Help with Piping

    I need some help please. The piping the goes from the SC to the IC that I am using continues to come apart. I will take any suggestions. I will try to attach more detail photos tonight.
    Attached Images Attached Images  


  2. #2
    Moderator OsideBill's Avatar
    Join Date
    Mar 2006
    Location
    United States
    Posts
    11,875
    +1
    30
    longer hose length and double up on the clamps.

  3. #3
    YamahaToys's Avatar
    Join Date
    Jan 2007
    Location
    Orange, TX
    Posts
    583
    Thanks Oside,

    Here are more detailed pics of were the separation is occurring.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	img111.jpg 
Views:	61 
Size:	62.5 KB 
ID:	146822   Click image for larger version. 

Name:	img112.jpg 
Views:	67 
Size:	49.8 KB 
ID:	146823  

  4. #4
    "Hustler" Inkaddict's Avatar
    Join Date
    Aug 2007
    Location
    NJ
    Posts
    4,712
    +1
    26
    Take it to someone with a tig welder and have them string a bead 1/4 inch from the edge of the tubing.

  5. #5
    YamahaToys's Avatar
    Join Date
    Jan 2007
    Location
    Orange, TX
    Posts
    583
    Thanks for the help guys.

  6. #6
    deansta's Avatar
    Join Date
    Jan 2009
    Location
    Sydney,Australia
    Posts
    782
    +1
    1

    Thumbs up

    Quote Originally Posted by Inkaddict View Post
    Take it to someone with a tig welder and have them string a bead 1/4 inch from the edge of the tubing.


    +1 on that

  7. #7
    Duke's Avatar
    Join Date
    Jul 2006
    Location
    Florida
    Posts
    10,004
    +1
    406
    Quote Originally Posted by Inkaddict View Post
    Take it to someone with a tig welder and have them string a bead 1/4 inch from the edge of the tubing.
    That would help!!

    Also check to make sure the T-bolt clamp isn't bottomed out. If its for 2 3/4" pipe and your using 2 1/2" it won't properly tighten down.

  8. #8
    YamahaToys's Avatar
    Join Date
    Jan 2007
    Location
    Orange, TX
    Posts
    583
    Quote Originally Posted by Duke View Post
    That would help!!

    Also check to make sure the T-bolt clamp isn't bottomed out. If its for 2 3/4" pipe and your using 2 1/2" it won't properly tighten down.
    Good point Duke,

    I might have switched the clamps without knowing when trying different configurations.

  9. #9
    mrbtd's Avatar
    Join Date
    Jul 2005
    Location
    Lindenhurst, Illinois, United States
    Posts
    4,309
    +1
    2
    Almost looks like you could rotate the pipes to the right and left so that they could line up better.

  10. #10
    v band, no more couplers or clamps to ever worry about. and they just say baller.

Page 1 of 2 1 2 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. help with factory pipe 800 dual cooling
    By timmy_philson in forum 2-Stroke Performance
    Replies: 7
    Last Post: 08-06-2008, 10:33 AM
  2. Guys, HELP with factory twin pipes.
    By Water4fire in forum 2-Stroke Performance
    Replies: 2
    Last Post: 06-19-2008, 09:20 PM
  3. Help with my Tripe pipe 1300
    By chris1200 in forum Yamaha PWC Performance (2-stroke)
    Replies: 1
    Last Post: 02-02-2008, 04:24 PM
  4. Help with pressure testing J pipe?
    By Vern in forum 4-Tec Performance
    Replies: 6
    Last Post: 10-31-2007, 10:46 PM
  5. Need help with triple pipe
    By mtrager in forum Yamaha PWC Performance (2-stroke)
    Replies: 13
    Last Post: 08-19-2007, 06:48 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •