I decided to open my own thread on my build. I used the combination of various stand builds to come up with my own. So far I have spent $60.90 on (4) 2"x2"x8' .095 Square Tubing and $32 on (eight) 5" Locking Caster Wheels. Four wheels for this stand another 4 for my 2 seater stand. I still have some metal left over to build on my 2nd Ski Stand for my shorter 2 seater Kawasaki. I will be posting my measurements as soon as I am done with the Project. Since I don't have my Casters yet, I had to guestimate the height of where the bunks will be. As I stated in another thread, I want to come as close as i can to making the bunks on the Trailer line up with the Ski Stand Bunk. This should make it easier to load and unload. Hence why you see the small piece of 2" tubing added for height.
Here are some pics of the first 3 days of "after work" cutting and welding.




Here are some pics of the first 3 days of "after work" cutting and welding.
Comment