Thought I would try and document my rebuild of a 1996 780. Not exciting for most, but maybe for some of the newer members. Tear down, disassembly, and labeling of all parts already complete. Please feel free to correct me if I state something incorrectly or do something wrong......
Day 1 - About 1.5 - 2 hours of work with some cleaning / prep.
Start with a clean matched set of crankcase halves. All mating surfaces to be clean and free of oil, grease, residue, old gaskets, etc. I use a green scouring pad to accomplish this as seen in the background of the top half picture.

Day 1 - About 1.5 - 2 hours of work with some cleaning / prep.
Start with a clean matched set of crankcase halves. All mating surfaces to be clean and free of oil, grease, residue, old gaskets, etc. I use a green scouring pad to accomplish this as seen in the background of the top half picture.
Comment